Light Steel Framing

SFS infill and light steel framing systems for multi-storey residential, student, hotel and commercial buildings, installed by gangs who do this every week.

Overview

Light steel framing is the majority of our work. We install SFS infill walls and light steel frame systems between and around primary structure, from setting out to a boarded, insulated frame that is ready for the facade.

Main contractors use us because we turn up with the right number of people, work to the programme and hand over a frame that the follow-on trades can build on without coming back to us.

What we do

  • SFS infill walling to concrete and steel frames
  • Light steel frame wall panels, stick-built and prefabricated
  • Setting out from the structural grid
  • Head and base track, deflection heads and bracing
  • Window and door openings, lintels and cills
  • External sheathing board and insulation
  • Fire and cavity barriers where they form part of the framing package
  • Coordination with the crane, scaffold and facade packages

Our process

Survey to handover, in the order it happens on site.

The same sequence on every job, so your site team knows what is coming next and when.
  1. 01

    Survey

    We check the structure, levels and deflection allowances against the drawings before anyone starts, so problems are found on paper rather than on the deck.

  2. 02

    Setting out

    Wall lines, openings and panel positions are set out from the structural grid and agreed with the site team.

  3. 03

    Framing

    Tracks, studs and panels are fixed, plumbed and braced floor by floor, with lifts coordinated around the crane and the rest of the programme.

  4. 04

    Openings

    Window and door openings are formed to the schedule with lintels, cills and jambs ready for the window installer.

  5. 05

    Boarding and insulation

    External sheathing board is fixed and taped and insulation installed within the frame, leaving a weather-ready line for the cladding.

  6. 06

    Handover

    Each floor or elevation is inspected, snagged and signed off so the next trade can start without delay.

Why contractors use us

Why main contractors bring us back for light steel framing.

  • Capacity for several sites at once

    With 15 to 20 operatives we run gangs of 5 to 6 on different sites at the same time, so your programme does not depend on one crew finishing elsewhere.

  • Run by someone who learned it on the tools

    The owner started installing framing and cladding in 2005 and now runs the business, so decisions are made quickly by someone who understands the work.

  • Programme and sequence

    We plan lifts, deliveries and floor sequences with your site team and report progress honestly, so you know where the package is every week.

  • Trained for the crane

    Crane supervisor, crane operator and slinger signaller training within the team means panel lifts are planned and run safely.

How we work

Panels lifted, staged and fixed in sequence.

Prefabricated panels arrive on programme, are craned onto the deck and installed floor by floor.

Also need the other package on the same building?

Rainscreen Cladding

Get in touch

Need light steel framing priced?

Call, message or send the drawings. We will come back to you with a straight answer on programme, capacity and price.